6/4/16
The building site has been compacted. So it solid and hard for the building to sit on. Builder used digger, levels and measured with string lines.
7/4/16
The builder are measing and cutting timber to make boxing for the concrete to be poured into.
The concrete they pour will be the classroom floor,
8/4/16
Today is the last day if the term. It is raining very hard. The builders are still building boxing and using the noisy nail guns.